So now the framing starts. 4 x 2 framing on rubber.

see the pile of rockwool in the background

and the plasterboard is applied.
This is a shot from inside showing the rear wall of the drum booth area.
On the right are the two opennings for the doors.

Then the internal ceilings

Control Room front wall

Next Page>>>>>

Cheers John

 

 

 

Webmaster - johnsay