There
has been a slight delay in the construction - we lost the
builder for a while - but the aircon has gone into the cavity
between the ceilings


some
pretty big units

also
the console is under construction in the control room

The
mike lines are from - drum booth - vocal booth - main Studio
- rec room next the the control room - plus additional lines
from the live area adjacent to the studio which will be used
for live concerts etc
Also
the drum booth is nearing completion - when we first talked
about the finish Kev showed me a room he liked that was done
out in old timber and old rusty galvanised roofing iron -
Kev and Jenny have added to that idea :):)

The
iron is glued to the plywood backing

This
is the look

Cheers
John 