This
is a sequence of shots made during the construction of Eric's
vocal booth.
pre_project_space
- this is where I used to record, soon to be occupied with the
new vocal booth

first_wall - literally the first wall i've ever built! alvin,
was a big help. total wall height is about two inches below
the joists from the floor above. i don't plan on attaching to
them.

two_walls - coming together. full frame
- with door opening and ceiling unattached to the structure
of the house,
except on the floor.
drywall up - 5/8" drywall all around with lots of caulk
on every seam!

rc_and_insulation - starting to really get quiet in here! note
the air intake duct in the corner. starts at the top and travels
the height of the wall before coming into the room at the floor.
similar duct on the other side of the room except air exits
from within the room at the ceiling.

start_auralex - starting to put up the auralex. i have no idea
what i'm doing with this stuff!

end_auralex - my brother calls this the torture chamber now.
you can yell pretty loud in here an not be heard upstairs, plus
it looks really spooky inside.

done_interior_shot - my new home with my new friend, the SP
B1.

done_exterior_shot - the new studio, and my first client!

cheers
Eric 